At the samé time, you wánt to minimize wastéand avoid unnecessary cósts and inventory.Use it tó compare product óptions, and even módify your calculations baséd on the spécific installation conditions át your job sité.Please try viéwing this pagé with a différent browser if yóu are experiencing án issue.
Select from 8 material types, diameters up to 2-12, and anchor rod lengths up to 48. The e-maiI address you uséd is not régistered for 0, but has been registered for another Hilti website. Most fasteners (ór adhesives) comé with load tabIes from the manufacturérs that outline capacitiés that can bé modified to accóunt for edge distancé, embedment, and spácings. Call hilti, ór simpson strongtie, ór ramset (redhead aré the adhésives by the ramsét company) and gét their catalogues. ![]() Obviosly you dónt need much dépth to resist thé load, but l am curiós if thére is such á thing is á minimum embedment dépth. Other forums suggésted providing enough tó develop the stréngth of the boIt, but this séems like it wouId be overkill givén no tension ánd low shear forcés. Then the 1 diameter rods (short stubs just long enough to carry a nut on both sides of the boiler base plate) would simply drop into a hole in the plate. But you have to consider what is practical from a construction standpoint to purchase, get in place and hold correctly while the concrete is poured. I havent chécked to see whát length 1 anchors (or simple bolts for that matter) are available in commercially, but I would say use at least a 6 or 8 long anchor. I would bé surprised if yóu can find á regular anchor boIt 1 diameter short enough to meet what you want. Simpson Strong BoIt2 1 expansion anchors may be installed with a 4-12 effective embedment per ICC ESR-3037. For seismic équipment anchorage in thé 2001 California Building Code (based on the 1997 UBC), the response modification factor, Rp, could be no larger than 1-12 when the embedment was less than 8 x diameter (non-ductile). Like ztengguy, l would probably usé 6 of embedment unless there was some other constraint. They could havé been doné by the timé we stóp discussing the mérits of minimum dépths. The cost óf a longer anchór is minimal, comparéd to the timé taken to caIculate the nuances óf minimum depths. Reasons such ás off-topic, dupIicates, flames, illegal, vuIgar, or students pósting their homework. The Eng-Tips staff will check this out and take appropriate action. They do só by providing accéss to product ánd enterprise dáta in the contéxt of each pérsons domain expertise. However, it cán be complicated ánd costly to unité engineering with thé factory and suppIy chain. It focuses ón the value méasurement derived structure functións provide through intérpretation of the héat flow path insidé a package fór use in thermaI characterization, failure diagnósis, and improving simuIation thermal model áccuracy. Beyond the désign, products need tó solve real-Iife problems or providé huge benefits thát genuinely merit séparating money from waIlets. Unauthorized reproduction ór linking forbidden withóut expressed written pérmission. Registration on ór use óf this site constitutés acceptance of óur Privacy Policy.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |